Chronometer and capacitance balance study laboratory

Authors

  • María José Acosta-Orozco Universidad de la Costa CUC, Barranquilla. (Colombia)
  • Andrés Felipe Carmona-Pertuz Universidad de la Costa CUC, Barranquilla. (Colombia)
  • Yeisy Ceballos-Quiceno Universidad de la Costa CUC, Barranquilla. (Colombia)
  • Jennifer Díaz-González Universidad de la Costa CUC, Barranquilla. (Colombia)
  • Melissa Ríos-Torres Universidad de la Costa CUC, Barranquilla. (Colombia)
  • Aida Huyke-Taboada Universidad de la Costa CUC, Barranquilla. (Colombia)

DOI:

https://doi.org/10.17981/bilo.4.1.2022.14

Keywords:

Work measurement, time study by stopwatch, efficiency

Abstract

The purpose of this practice was to learn how to relate to the management of chronometers and the different forms that exist for the collection of data; as well as to identify and propose new solutions where efficiency problems are evident, working conditions, methods, etc. This practice was carried out in 3 phases: in the first one a detachable cart and an operator were needed and the cart was divided into elements to then take time to each element. In the second phase, the space where the assembly of the carts was to be carried out on a conveyor belt was accommodated; noise, lighting and 4 stations were measured in which each operator was to be located. In the phase, we proceeded to assign certain elements in each of the stations and the area of work of each operator was conditioned, to then begin the process of assembling the carts. Process productivities were calculated to see how efficient the improvements implemented in the process had been; the results were: PMO 1: 11.82 uni/h-h and PMO 2: 14.08 uni/h-h

Downloads

Download data is not yet available.

References

Villegas García M., Alcaraz Martínez J., Pascual Saura H., Gonzálvez Ortega J.J., Ballesta Cabrero A., Moreno Rodríguez J.M., Baeza Alcaraz Á., “Improvement of the management of outpatient consultations by a direct automatic citation of interconsultations [Mejora de la gestión de las consultas externas hospitalarias mediante la cita automática directa de interconsultas]”, Revista española de salud pública, vol. 92, May 2018.

F. ORMACHEA, «Estudio de tiempos por cronometraje: caso de operaciones de costura bajo corridas cortas.,» HOLISTICA-Revista de ingeniería Industrial de PUCP, pp. 37-44, 2012.

Wallace DJ , Kahn JM , Angus DC , Martin-Gill C , Callaway CW , Rea TD , Chhatwal J , Kurland K , Seymour CW, «Accuracy of Prehospital Transport Time Estimation,» ACADEMIC EMERGENCY MEDICINE, pp. 9-16, jan 2014.

d’acelino-e-Porto OS, Almeida MB. “Validade e fidedignidade do uso de cronômetros e vídeo para avaliac¸ ão do tempo de execuc¸ ão do Line Drill Test”, Rev Andal Med Deporte, pp. 5, Julio 2017.

Z. M. Abdelaal Mohamed, «Injection data analysis using material balance time for CO2 storage capacity estimation in deep closed saline aquifers,» JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, vol. 208, nº 109385, jan 2022.

Ruíz-Ibarra, J. I., Ramírez-Leyva, A., Luna-Soto, K., Estrada-Beltran, J. A., & Soto-Rivera, O. J., «OPTIMIZACIÓN DE TIEMPOS DE PROCESO EN DESESTIBADORA Y EN LLENADORA,» Ra Ximhai , vol. 13, nº 3, pp. 291-298, 2017.

J. Morales Bustamante, “Optimización en la línea de llenado de Cuarto de Galón de Aceite”, REDCOL, Nov 2017.

J. Orjuela, “Incidencia del diseño de la cadena de suministro alimentaria en el equilibrio de flujos logísticos”, REDCOL, Julio 2018.

D. Apolo, R. Guaman, E. Colina-Morles, A. Luzuriaga, L. Siguenza-Guzman. "Analysis of standard-times in assembly companies as support for decision-making", Revista Ibérica de Sistemas e Tecnologias de Informacao, Abril 2020.

H.P. Tijero, J.J. Gutiérrez. "Development of real-time and mixed criticality distributed systems through the DDS standard", RIAI - Revista Iberoamericana de Automatica e Informatica Industrial, 2018.

S. Abolghasem, N. Mancilla-Cubides, "Optimization of machining parameters for product quality and productivity in turning process of aluminum", Ingeniería y Universidad, 2022.

I.O. de Landazuri Suárez, "Design of comminution in ceramic plants using a simulation-based optimization approach", Ingeniería e investigación, agosto 2021.

Adrián M. Andrade, César A. Del Río y Daissy L. Alvear, "Estudio de Tiempos y Movimientos para Incrementar la Eficiencia en una Empresa de Producción de Calzado", SCIELO, junio 2019.

J. PINEDA, "estudio de tiempos y movimientos en la línea de producción de piso de granito en la fábrica Casa blanca s.a." UNIVERSIDAD DE SAN CARLOS DE GUATEMALA, octubre 2005.

Stevens Ramírez Jaramillo, Jhon Davis Lasso Garcia, Ing. García Delgado Raul Alberto y Carlos Tavera, "PROPUESTA PARA EL ESTUDIO DE TIEMPOS Y MOVIMIENTOS EN LA LÍNEA 1 EN LA FABRICACIÓN DE SANDALIAS EN UNA PYME", Universidad Santiago de Cali, 2019.

GONZÁLEZ VÁZQUEZ Isidro, ARTEAGA ITURRARÁN Raúl, GARÍA Martha Patricia y PÉREZ PIÑA Sylvia Erik, "Estudio de tiempos y movimientos para la Implementación de métricos de control de acuerdo a las necesidades de los clientes" ,Investigaciones sociales, Marzo 2017.

S. Guaraca, «Mejora de la productividad, en la sección de prensado de pastillas, mediante el estudio de métodos y la medición del trabajo, de la fábrica de frenos automotrices EGAR S.A,» Quito, 2015.

G. Miño, J. Moyano y C. Santillán, «Tiempos estándar para balanceo de línea en área soldadura del automóvil modelo cuatro,» Ingeniería industrial, vol. 40, nº 2, pp. 110-122, 2019.

P. Callo, «PROPUESTA DE MEJORA PARA AUMENTAR LA PRODUCTIVIDAD, BASADO EN UN ESTUDIO DE TIEMPOS Y DETERMINACIÓN DEL TIEMPO ESTÁNDAR DE LA LÍNEA DE PRODUCCIÓN DE VIDRIO INSULADO EN LA CORPORACIÓN VIDRIO GLASS,» Arequipa, 2017.

R. Espinoza y G. Trinidad, «Determinación del tiempo estándar en el proceso de elaboración de reportes en una empresa de telecomunicaciones,» ABC DEL PERÚ S.A.C., Lima, 2017.

Published

2022-06-21

How to Cite

Acosta-Orozco, M. J. ., Carmona-Pertuz, A. F. ., Ceballos-Quiceno, Y. ., Díaz-González, J. ., Ríos-Torres, M., & Huyke-Taboada, A. . (2022). Chronometer and capacitance balance study laboratory. Boletín De Innovación, Logística Y Operaciones, 4(1). https://doi.org/10.17981/bilo.4.1.2022.14

Most read articles by the same author(s)