Earliness/Tardiness Production Problem using Semi-Infinite Optimization

Authors

DOI:

https://doi.org/10.17981/ingecuc.16.2.2020.09

Keywords:

semi-infinite optimization, outer approximations methods, just-in-time, stochastic algorithms, earliness/Tardiness production

Abstract

Introduction— An Earliness/Tardiness Production Problem is considered, with the objective of delivering products of a company in an optimum time. Based on the problem settled in [1], which was solved with a genetic method, we develop this semi-infinite optimization problem (SIP) with the stochastic outer approximations method created by [2].

Objective— Obtain a better solution of the problem or at least get a similar solution is the goal of this work.

Methodology— With regard to the numerical solution a stochastic outer approximation algorithm was used, in addition numerical experiments were performed in MATLAB.

Results— By last, the algorithm developed will be applied in a real case of Colombian production Company, to give the optimum setting for production planning.

Conclusions— The solution obtained in this work has a bigger function value in contrast with the solutions obtained in [1], [3], but it satisfies all constrains.

Downloads

Download data is not yet available.

Author Biography

Juan Camilo Valencia Solano, Universidad Nacional de Colombia. Bogotá, (Colombia)

Matematico de la Universidad Nacional de Colombia. Bogota. 2018

Analista de datos, Unilever, Colombia

References

D. Wang & S.C. Fang, “A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm,” Computers Math Applic, vol. 31, no. 8, pp. 95–106, Apr. 1996. https://doi.org/10.1016/0898-1221(96)00034-X

Y. Volkov & S.K. Zavriev, “A general stochastic outer approximations method,” SIAM J Control Optim, vol. 35, no. 4, pp. 1387–1421, 1997. https://doi.org/10.1137/ S0363012994263202

D. Wang & Y. Li, “A semi-infinite programming model for earliness/tardiness production planning with simulated annealing,” Math Comput. Modelling, vol. 26, no. 7, pp. 35–42, Oct. 1997. https://doi.org/10.1016/S0895-7177(97)00184-2

R.Z. Ríos & Y.A. Ríos, Just-in-time systems. NY, USA: Springer, 2012.

JMA, Kanban and JUST-IN-TIME in TOYOTA. BR, USA: Routledge, 2017. https://doi.org/10.1201/9780203749722

T. Molina Salazar, “Impacto de las Técnicas de Producción y las Prácticas de Calidad en los Beneficios JIT,” Cultura Científica y Tecnológica, vol. 14, no. 63, pp. 88–101, 2017.Available: http://erevistas.uacj.mx/ojs/index.php/culcyt/issue/viewIssue/605/716

S.Y. Gao, J. Sun, J. & S. Wu, “A semi-infinite programming approach to two-stage stochastic linear programs with high-order moment constraints,” Optim Lett, vol. 12, no. 6, pp. 1237–1247, Aug. 2018.https://doi.org/10.1007/s11590-016-1095-4

G. Blom,.Probability and Statistics Theory and Applications, NY, USA: Springer, 1989.

Y. Wardi, “A Stochastic Algorithm for Optimization Problems with Continua of Inequalities,” J Optim Theory Appl, vol. 56, no. 2, pp. 286–311, Feb. 1998. https://doi.org/10.1007/BF00939413

Published

2020-08-31

How to Cite

Fedosova, A., & Valencia Solano, J. C. (2020). Earliness/Tardiness Production Problem using Semi-Infinite Optimization. INGE CUC, 16(2), 131–140. https://doi.org/10.17981/ingecuc.16.2.2020.09